Learning objective

Build a reviewable control loop for 设备健康、预防性维护和停机复盘 and verify normal and exception flows.

Roles

Process owners, quality, maintenance, warehouse, production, finance, IT and approvers

Prerequisites

  • Confirm masters, access, approval matrix and retention rules.
  • Prepare normal, exception, reversal and interface-failure tests.

Completion checks

  • Results trace to source, owner and approval.
  • Quantity, status, time and exception closure evidence are reviewable.

Common errors

  • Testing only the happy path.
  • Fixing exceptions offline without evidence.
  • Overwriting history without version retention.

Thailand project note

泰国实施需确认泰文/英文主数据、THB及外币、Asia/Bangkok时区、职责分离与当地记录留存。涉及VAT、WHT、BOI、海关、法定会计、产品合规或安全的结论,须由合格泰国专业人员按现行规则复核;本文不构成税务、法律或合规意见。

Related modules

manufacturingquality-managementtraceability

03

Steps

01Create masters for equipment, lines, critical parts, measurement points and accountable roles.
02Plan maintenance by runtime hours, calendar cycle, condition or risk.
03Link checks, servicing, failures, spare parts and outsourced work to the asset.
04Record downtime start/end, symptom, affected orders and temporary action.
05Review plan attainment, failure count, MTTR and repeat failures.
06Review high-risk assets, adjust intervals, spares and escalation with approval evidence.
  1. 01

    Create masters for equipment, lines, critical parts, measurement points and accountable roles.

  2. 02

    Plan maintenance by runtime hours, calendar cycle, condition or risk.

  3. 03

    Link checks, servicing, failures, spare parts and outsourced work to the asset.

  4. 04

    Record downtime start/end, symptom, affected orders and temporary action.

  5. 05

    Review plan attainment, failure count, MTTR and repeat failures.

  6. 06

    Review high-risk assets, adjust intervals, spares and escalation with approval evidence.

04

Implementation notes

  • Pilot one organisation and representative flow.