U9 cloud Labour Efficiency Variance: Link Standards to Shop-Floor Reporting

Compare standard hours, actual hours and accepted output while separating waiting, rework and data issues.

人工效率差异 / Labour Efficiency Variance18 minUpdated 2026-08-21
01

Learning objective

Create order-operation efficiency variance and improvement closure.

Roles

Finance, cost accounting, process owners, IT, key users, consultants and audit

Prerequisites

  • Confirm entity, period, currency, masters and access.
  • Prepare approved normal and exception data.
  • Define approval, cut-off and change rules.

Completion checks

  • Results trace to source and accountable role.
  • Quantity, amount, period and status are reviewable.
  • Exceptions retain cause, action and closure evidence.

Common errors

  • Overwriting historical versions.
  • Masking source errors with manual adjustments.
  • Testing only normal flow.

Thailand project note

Thai implementations should confirm Thai/English masters, THB and foreign currencies, Asia/Bangkok time, segregation, approval and local retention. This is an ERP control guide only; VAT, WHT, BOI, customs and statutory-accounting conclusions require qualified Thai professional review.

Related modules

finance-controlcost-analysismanagement-accounting

03

Steps

01Freeze routing and standard-hour version, team and units.
02Capture actual start, finish, downtime, rework and accepted output.
03Check duplicate reports, cross-shift records, missing people and abnormal duration.
04Calculate allowed standard hours and actual variance by order and operation.
05Classify waiting, speed, rework, routing and data causes.
06Assign production or engineering action and compare later-period improvement.
  1. 01

    Freeze routing and standard-hour version, team and units.

  2. 02

    Capture actual start, finish, downtime, rework and accepted output.

  3. 03

    Check duplicate reports, cross-shift records, missing people and abnormal duration.

  4. 04

    Calculate allowed standard hours and actual variance by order and operation.

  5. 05

    Classify waiting, speed, rework, routing and data causes.

  6. 06

    Assign production or engineering action and compare later-period improvement.

04

Implementation notes

  • Pilot one entity and period.
  • Exceptions require source, owner and closure evidence.
  • Menus and fields depend on current release and blueprint.
05

References

  • YonSuite 客户成功服务 ↗用友 · Accessed: 2026-08-21 · Applicable version: 业财对账及财务服务官方范围;具体菜单以客户版本为准
  • U9 cloud 精细化成本 ↗用友 U9 cloud · Accessed: 2026-08-21 · Applicable version: 多成本核算、订单、项目及工序成本官方范围
  • U9 cloud 成本管理数智化 ↗用友 U9 cloud · Accessed: 2026-08-21 · Applicable version: 成本要素、计算、标准实际对比及分析公开说明