U9 cloud Labour Efficiency Variance: Link Standards to Shop-Floor Reporting
Compare standard hours, actual hours and accepted output while separating waiting, rework and data issues.
Learning objective
Create order-operation efficiency variance and improvement closure.
Roles
Finance, cost accounting, process owners, IT, key users, consultants and audit
Prerequisites
- Confirm entity, period, currency, masters and access.
- Prepare approved normal and exception data.
- Define approval, cut-off and change rules.
Completion checks
- Results trace to source and accountable role.
- Quantity, amount, period and status are reviewable.
- Exceptions retain cause, action and closure evidence.
Common errors
- Overwriting historical versions.
- Masking source errors with manual adjustments.
- Testing only normal flow.
Thailand project note
Thai implementations should confirm Thai/English masters, THB and foreign currencies, Asia/Bangkok time, segregation, approval and local retention. This is an ERP control guide only; VAT, WHT, BOI, customs and statutory-accounting conclusions require qualified Thai professional review.
Related modules
Steps
- 01
Freeze routing and standard-hour version, team and units.
- 02
Capture actual start, finish, downtime, rework and accepted output.
- 03
Check duplicate reports, cross-shift records, missing people and abnormal duration.
- 04
Calculate allowed standard hours and actual variance by order and operation.
- 05
Classify waiting, speed, rework, routing and data causes.
- 06
Assign production or engineering action and compare later-period improvement.
Implementation notes
- Pilot one entity and period.
- Exceptions require source, owner and closure evidence.
- Menus and fields depend on current release and blueprint.
References
- YonSuite 客户成功服务 ↗用友 · Accessed: 2026-08-21 · Applicable version: 业财对账及财务服务官方范围;具体菜单以客户版本为准
- U9 cloud 精细化成本 ↗用友 U9 cloud · Accessed: 2026-08-21 · Applicable version: 多成本核算、订单、项目及工序成本官方范围
- U9 cloud 成本管理数智化 ↗用友 U9 cloud · Accessed: 2026-08-21 · Applicable version: 成本要素、计算、标准实际对比及分析公开说明