U9cloudManufacturingIntermediateContent quality · 94/100

U9 cloud Quality Release: Pending, Quarantine and Authorised Release

Complete the process with traceable steps and control points.

质量放行 / Quality Release18 minUpdated 2026-08-21
01

Learning objective

Complete normal, exception and reversal scenarios in test with acceptance evidence.

Roles

Process owners, planning, purchasing, warehouse, production, quality, finance and IT

Prerequisites

  • Masters, access and approvals are confirmed.
  • Repeatable test data are prepared.

Completion checks

  • Documents, quantities, status and ownership are traceable.
  • Results agree with inventory and finance interfaces.

Common errors

  • Going live before validating data.
  • Handling exceptions offline without evidence.

Thailand project note

For Thailand, confirm Thai/English masters, THB and foreign currencies, Asia/Bangkok time, segregation of duties and local retention. VAT, WHT, customs, BOI, statutory accounting, product compliance and occupational safety require current review by qualified Thai professionals; this is not legal or tax advice.

03

Steps

01Define pending, accepted, quarantine, rejected and restricted-use stock states.
02After receipt or completion assign the correct state and lock unavailable quantity.
03Inspection retains specification, result, person, time, equipment and attachment.
04Only authorised quality roles may change status from approved results.
05Concession limits quantity, lot, use, validity and approver.
06Reconcile status changes, stock movement, issue and shipment; detect unauthorised use.
  1. 01

    Define pending, accepted, quarantine, rejected and restricted-use stock states.

  2. 02

    After receipt or completion assign the correct state and lock unavailable quantity.

  3. 03

    Inspection retains specification, result, person, time, equipment and attachment.

  4. 04

    Only authorised quality roles may change status from approved results.

  5. 05

    Concession limits quantity, lot, use, validity and approver.

  6. 06

    Reconcile status changes, stock movement, issue and shipment; detect unauthorised use.

04

Implementation notes

  • Pilot one organisation and representative item.
  • Every exception needs an owner and due date.
05

References