U9 cloud Quality Sampling: Plan, Effectivity and Disposition

Complete the process with controlled steps and evidence.

质量抽样 / Quality Sampling18 minUpdated 2026-08-21
01

Learning objective

Complete one traceable test scenario and verify exception recovery.

Roles

Process owners, planning, purchasing, warehouse, production, quality, finance and IT

Prerequisites

  • Relevant masters, access and approvals are confirmed.
  • Normal, exception and reversal test data are ready.

Completion checks

  • Documents, quantities, statuses and owners are traceable.
  • Exception closure agrees with stock and finance interfaces.

Common errors

  • Enabling in production before validation.
  • Handling exceptions offline without system evidence.

Thailand project note

For Thailand, confirm Thai/English masters, THB and foreign currencies, Asia/Bangkok time, segregation of duties and local record retention. VAT, WHT, customs, BOI, statutory accounting, product compliance and occupational safety require current review by qualified Thai professionals; this is not legal or tax advice.

03

Steps

01Define sampling plans and owners by item, supplier, operation and risk.
02Record lot size, sample size, accept/reject criteria, characteristics and gauge needs.
03Release with version and effectivity; never overwrite historical plans.
04At inspection select the valid plan by lot and record every sample result.
05Quarantine the lot immediately when rejection criteria are met.
06Analyse defect trends; quality and engineering approve plan changes.
  1. 01

    Define sampling plans and owners by item, supplier, operation and risk.

  2. 02

    Record lot size, sample size, accept/reject criteria, characteristics and gauge needs.

  3. 03

    Release with version and effectivity; never overwrite historical plans.

  4. 04

    At inspection select the valid plan by lot and record every sample result.

  5. 05

    Quarantine the lot immediately when rejection criteria are met.

  6. 06

    Analyse defect trends; quality and engineering approve plan changes.

04

Implementation notes

  • Pilot one organisation and representative item.
  • Give every exception an owner and due date.