U9 cloud Wave Picking: Group, Release and Resolve Variance

Complete the process with traceable steps and control points.

波次拣货 / Wave Picking18 minUpdated 2026-08-21
01

Learning objective

Complete normal, exception and reversal scenarios in test with acceptance evidence.

Roles

Process owners, planning, purchasing, warehouse, production, quality, finance and IT

Prerequisites

  • Masters, access and approvals are confirmed.
  • Repeatable test data are prepared.

Completion checks

  • Documents, quantities, status and ownership are traceable.
  • Results agree with inventory and finance interfaces.

Common errors

  • Going live before validating data.
  • Handling exceptions offline without evidence.

Thailand project note

For Thailand, confirm Thai/English masters, THB and foreign currencies, Asia/Bangkok time, segregation of duties and local retention. VAT, WHT, customs, BOI, statutory accounting, product compliance and occupational safety require current review by qualified Thai professionals; this is not legal or tax advice.

03

Steps

01Define wave rules by carrier, route, cut-off, temperature, order priority and zone.
02Select approved allocatable orders and prevent duplicate wave inclusion.
03Trial task, labour, equipment and packing capacity before release.
04Scan-pick by location and route, recording short, wrong and substitute picks.
05Verification, consolidation, packing and loading preserve order-container links.
06Reconcile completion, shortage, remaining tasks and shipment result.
  1. 01

    Define wave rules by carrier, route, cut-off, temperature, order priority and zone.

  2. 02

    Select approved allocatable orders and prevent duplicate wave inclusion.

  3. 03

    Trial task, labour, equipment and packing capacity before release.

  4. 04

    Scan-pick by location and route, recording short, wrong and substitute picks.

  5. 05

    Verification, consolidation, packing and loading preserve order-container links.

  6. 06

    Reconcile completion, shortage, remaining tasks and shipment result.

04

Implementation notes

  • Pilot one organisation and representative item.
  • Every exception needs an owner and due date.
05