U9 cloud WIP Count: Operation Quantity and Cost Reconciliation

Complete the process with controlled steps and evidence.

在制盘点 / WIP Count18 minUpdated 2026-08-21
01

Learning objective

Complete one traceable test scenario and verify exception recovery.

Roles

Process owners, planning, purchasing, warehouse, production, quality, finance and IT

Prerequisites

  • Relevant masters, access and approvals are confirmed.
  • Normal, exception and reversal test data are ready.

Completion checks

  • Documents, quantities, statuses and owners are traceable.
  • Exception closure agrees with stock and finance interfaces.

Common errors

  • Enabling in production before validation.
  • Handling exceptions offline without system evidence.

Thailand project note

For Thailand, confirm Thai/English masters, THB and foreign currencies, Asia/Bangkok time, segregation of duties and local record retention. VAT, WHT, customs, BOI, statutory accounting, product compliance and occupational safety require current review by qualified Thai professionals; this is not legal or tax advice.

03

Steps

01Define count date, production area, orders, operations and cut-off rules.
02Clear unreported work, unposted issue/return/transfer and failed interfaces.
03Freeze or log exceptional movements and save the system WIP snapshot.
04Count quantity, status, lot and completion by work order and operation.
05Independently recount variance and investigate timing, scrap and wrong operation.
06After approval reconcile WIP quantity, cost, inventory and ledger interface.
  1. 01

    Define count date, production area, orders, operations and cut-off rules.

  2. 02

    Clear unreported work, unposted issue/return/transfer and failed interfaces.

  3. 03

    Freeze or log exceptional movements and save the system WIP snapshot.

  4. 04

    Count quantity, status, lot and completion by work order and operation.

  5. 05

    Independently recount variance and investigate timing, scrap and wrong operation.

  6. 06

    After approval reconcile WIP quantity, cost, inventory and ledger interface.

04

Implementation notes

  • Pilot one organisation and representative item.
  • Give every exception an owner and due date.