U9cloudManufacturingIntermediateContent quality · 94/100

U9 cloud 批次条码追溯:从收料到发运的调查链

批次、条码、PDA和质量调查 with traceable records, approvals and exception closure.

批次与条码追溯 / Lot and Barcode Traceability20 minUpdated 2026-08-21
01

Learning objective

Build a reviewable control loop for 批次、条码、PDA和质量调查 and verify normal and exception flows.

Roles

Process owners, quality, maintenance, warehouse, production, finance, IT and approvers

Prerequisites

  • Confirm masters, access, approval matrix and retention rules.
  • Prepare normal, exception, reversal and interface-failure tests.

Completion checks

  • Results trace to source, owner and approval.
  • Quantity, status, time and exception closure evidence are reviewable.

Common errors

  • Testing only the happy path.
  • Fixing exceptions offline without evidence.
  • Overwriting history without version retention.

Thailand project note

泰国实施需确认泰文/英文主数据、THB及外币、Asia/Bangkok时区、职责分离与当地记录留存。涉及VAT、WHT、BOI、海关、法定会计、产品合规或安全的结论,须由合格泰国专业人员按现行规则复核;本文不构成税务、法律或合规意见。

Related modules

manufacturingquality-managementtraceability

03

Steps

01Confirm item, lot, serial, package and barcode rules and uniqueness.
02At receipt, scan supplier lot, quantity, inspection status and location.
03Scan issue, operation moves, completion reporting and inspection against the production order.
04Before shipment, verify finished lot, customer, quantity, label and delivery documents.
05For a quality issue, trace from finished lot to materials, operations, equipment, people and inspection.
06Create affected-stock, segregation, cause-evidence and approved-disposition records.
  1. 01

    Confirm item, lot, serial, package and barcode rules and uniqueness.

  2. 02

    At receipt, scan supplier lot, quantity, inspection status and location.

  3. 03

    Scan issue, operation moves, completion reporting and inspection against the production order.

  4. 04

    Before shipment, verify finished lot, customer, quantity, label and delivery documents.

  5. 05

    For a quality issue, trace from finished lot to materials, operations, equipment, people and inspection.

  6. 06

    Create affected-stock, segregation, cause-evidence and approved-disposition records.

04

Implementation notes

  • Pilot one organisation and representative flow.
  • Menus, fields and interfaces depend on the release and approved blueprint.
05

References