U9cloudManufacturingIntermediateContent quality · 94/100

U9 cloud Quality: Inspection, Nonconformance and Disposition

Connect incoming, in-process and final inspection with quarantine, review, disposition and verification to prevent unintended use.

质量管理 / Quality Management19 minUpdated 2026-08-21
01

Learning objective

Complete an evidence chain from nonconformance detection through verified closure.

Roles

Quality, warehouse, purchasing, production, engineering and supplier quality

Prerequisites

  • Defined specifications, sampling, defect codes and quarantine status.
  • Configured disposition and concession authority.

Completion checks

  • Nonconforming quantity balances from quarantine to final disposition.
  • Closure includes cause, approval, execution and effectiveness evidence.

Common errors

  • Using material before inspection or manually bypassing quarantine.
  • Recording defects without checking corrective-action effectiveness.

Thailand project note

For Thailand, confirm Thai/English business and item masters, THB and foreign currencies, Asia/Bangkok time, segregation of duties, electronic records and local document retention. VAT, WHT, customs, BOI, statutory accounting, product compliance and occupational-safety settings require current review by qualified Thai professionals; this tutorial is not legal or tax advice.

03

Steps

01Define inspection type, sampling, characteristics, specifications and roles by item, supplier, operation and risk.
02When receipt or reporting triggers inspection, lock the lot and quantity; unjudged material must not become available.
03Record measurements, result, inspector, equipment, time and attachments instead of only a pass flag.
04Quarantine nonconforming material immediately and link a unique record to purchase, order, lot and defect code.
05Quality, engineering, purchasing or production reviews return, rework, concession or scrap with approval basis.
06Reinspect after disposition; quantity and inventory status must match the decision.
07Analyse repeat defects, assign corrective action, due date and effectiveness check; confirm no open stock before closure.
  1. 01

    Define inspection type, sampling, characteristics, specifications and roles by item, supplier, operation and risk.

  2. 02

    When receipt or reporting triggers inspection, lock the lot and quantity; unjudged material must not become available.

  3. 03

    Record measurements, result, inspector, equipment, time and attachments instead of only a pass flag.

  4. 04

    Quarantine nonconforming material immediately and link a unique record to purchase, order, lot and defect code.

  5. 05

    Quality, engineering, purchasing or production reviews return, rework, concession or scrap with approval basis.

  6. 06

    Reinspect after disposition; quantity and inventory status must match the decision.

  7. 07

    Analyse repeat defects, assign corrective action, due date and effectiveness check; confirm no open stock before closure.

04

Implementation notes

  • Concession requires authorised scope and validity.
  • Inspection-equipment status should be traceable.
05

References